跳至主要内容
两名身穿白色实验室外套的女性一起看着电脑屏幕

Site Engineering Specialist – Maintenance, Project Execution, Planning and Scheduling

新加坡, 新加坡 Regular 发布于   Oct. 19, 2026 申请截止于   Nov. 30, 2026
立即申请

Job title: Site Engineering Specialist – Maintenance, Project Execution, Planning and Scheduling

  • Location:  Singapore

About the Job: Site Engineering Specialist combines maintenance and reliability with project engineering. The role keeps process and utility equipment running reliably through CMMS-driven planning, SOPs, and deviation management, while delivering capital and modification projects from concept to handover (PMR, URS, Change Control, IQ/OQ/PQ).


About Sanofi:

We’re an R&D-driven, AI-powered biopharma company committed to improving people’s lives and delivering compelling growth. Our deep understanding of the immune system – and innovative pipeline – enables us to invent medicines and vaccines that treat and protect millions of people around the world. Together, we chase the miracles of science to improve people’s lives. 


Key Responsibilities

Maintenance & Reliability

  • Oversee operation, maintenance, planning/scheduling, and performance monitoring of process equipment and utility/facility systems (rotating equipment, pumps, reactors, spray driers, electrical systems, air compressors, chillers, AHUs, cooling towers, water systems, static equipment and related infrastructure)
  • Act as CMMS expert (SAP or equivalent) for planning, scheduling, and tracking preventive and corrective maintenance
  • Coordinate with vendors/contractors for preventive maintenance, servicing, and repair
  • Write, review, and update SOPs for utility and equipment operations
  • Prepare Reliability KPIs and annual utility performance reports
  • Investigate, document, and report deviations/non-conformances; drive CAPA
  • Respond to and troubleshoot equipment/utility breakdowns and emergencies
  • Support sustainability initiatives (energy/water efficiency, emissions reduction, resource optimization)

Project Execution & Engineering Change

  • Coordinate and execute engineering/capital projects from concept through commissioning, handover, and close-out
  • Develop, track, and update project schedules, milestones, and action logs
  • Conduct site inspections to monitor construction, installation, and commissioning against approved plans
  • Prepare and manage Plant Modification Requests (PMR), User Requirement Specifications (URS), and Change Controls
  • Support qualification/validation activities (IQ, OQ, PQ)
  • Prepare project reports, punch lists, commissioning reports, and close-out documentation
  • Support audits, inspections, and regulatory reviews related to projects and equipment modifications

Vendor, Budget & Stakeholder Management

  • Participate in capital and maintenance budget planning
  • Assist in vendor selection, technical evaluations, and bid assessments; monitor vendor/contractor performance
  • Coordinate cross-functional stakeholders, contractors, and consultants
  • Track KPIs for schedule adherence, cost performance, safety, and quality

Compliance & Continuous Improvement

  • Ensure compliance with EHS, regulatory, and internal engineering standards
  • Support implementation of engineering and maintenance best practices
  • Participate in lessons-learned reviews and continuous improvement initiatives

Qualifications & Requirements

Essential

  • Bachelor’s degree in engineering (Electrical and, Instrumentation, Automation, discipline)
  • Experience in maintenance/reliability engineering and/or project engineering within an industrial or regulated environment
  • CMMS proficiency (SAP or equivalent) and understanding of maintenance planning/scheduling
  • Strong written communication skills — SOPs, deviation reports, project reports
  • Ability to manage multiple priorities/projects simultaneously
  • Proficient in Microsoft Office (Word, Excel, PowerPoint, Project); familiarity with BMS is a plus
  • Good analytical, troubleshooting, and problem-solving skills

Preferred

  • Experience in a regulated industry (pharmaceutical, biotech, chemical, or similar GMP/EHS environment)
  • Knowledge of GMP, Change Control, and Validation processes
  • Familiarity with AutoCAD and engineering drawing review
  • Experience managing contractors/vendors in a live operational environment

Key Competencies

  • Strong engineering fundamentals and technical problem-solving
  • Effective stakeholder communication across all organizational levels
  • High accountability, ownership, and attention to detail
  • Ability to work independently and collaboratively across cross-functional teams

Working Conditions

  • Combination of office-based work and regular site activities
  • Occasional work outside regular hours during shutdowns/critical project phases
  • PPE required during site visits, inspections, and construction oversight

Why Choose Us

Join Sanofi as a Site Engineering Specialist

  • 🔬 Purpose-driven work: You'll keep the equipment and utilities running that directly support the manufacture of medicines and vaccines — your reliability work has a direct line to patient impact.
  • 🏗️ Breadth of ownership: This role spans both maintenance/reliability and project engineering, giving you end-to-end exposure — from day-to-day asset performance to leading capital projects from concept through commissioning.
  • 📈 Growth and variety: Work across diverse systems — rotating equipment, utilities, electrical systems, and facility infrastructure — while building skills in GMP, Change Control, and validation (IQ/OQ/PQ).
  • 🤝 Cross-functional exposure: Regular collaboration with Quality, EHS, Operations, vendors, and project stakeholders builds strong organizational visibility and relationships.
  • 💡 Culture of continuous improvement: Be part of lessons-learned reviews and best-practice initiatives that shape how the site operates.
  • ❤️ Values-led organization: Work guided by Sanofi's values — Aim Higher, Act for Patients, Be Bold, and Lead Together — in a company chasing the miracles of science.

PursueProgress. Discover Extraordinary. 

Join Sanofi and step into a new era of science - where your growth can be just as transformative as the work we do. We invest in you to reach further, think faster, and do what’s never-been-done-before. You’ll help push boundaries, challenge convention, and build smarter solutions that reach the communities we serve. Ready to chase the miracles of science and improve people’s lives? Let’s Pursue Progress and Discover Extraordinary – together. 

At Sanofi, we provide equal opportunities to all regardless of race, color, ancestry, religion, sex, national origin, sexual orientation, age, citizenship, marital status, disability, gender identity, protected veteran status or other characteristics protected by law. 

null

追寻 发展。探索 菲凡。

加入赛诺菲,开启科学新时代。在这里,你的成长将如我们的工作成果一样具有变革性。我们帮助你发展,助你走得更远、思考得更快、做前所未有的事。你将与我们一起突破边界、挑战常规,打造更智慧的解决方案,惠及全球社区。准备好追寻科学的奇迹,改善人们的生活了吗?让我们携手追寻发展,探索非凡。

赛诺菲致力于为所有员工提供平等的就业机会,不因种族、肤色、血统、宗教、性别、国籍、性取向、年龄、公民身份、婚姻状况、残疾、性别认同、受保护的退伍军人身份或其他受法律保护的特征而有所差异。

立即申请
  • 您还没有查看任何职位。

  • 您还没有保存任何职位。

体验可能性

  • 您保存的职位

    了解更多
  • Ama

    Ama puts her project management techniques and ServiceNow knowledge to use to help advance Sanofi’s Digital Data operating model. Learn how our team connects data and AI to do what’s never been done before.

    了解更多
  • Cambridge Crossing

    We're bringing together 2,500 people from across our organization — R&D, Medical, Commercial and Global colleagues all working to realize the power of collaboration.

    了解更多
  • Innovation in Action

    Our flexible lab of the future will transform how we conduct research, while our innovation center will be fully integrated with existing R&D locations.

    了解更多
  • Sanofi’s AI Centre of Excellence in Toronto

    The Centre is focused on using leading technologies to develop world-class data and artificial intelligence (AI) products to create value for the health sector.

    了解更多
  • Sanofi Canada's Philanthropic Efforts

    By chasing the miracles of science to improve people’s lives, we surprise ourselves with what we can achieve. Our team is humbled by the impact our efforts make.

    了解更多
  • Sustainable and Green

    Our new facility was built to minimize the environmental impact — helping protect our planet and people. Using resources efficiently, we're providing greener, healthier workspaces.

    了解更多
  • Terms and Conditions

    了解更多
  • 了解更多
  • 我们的故事

    我们关注每一个员工的声音。因为,我们的未来取决于所有员工的付出与努力。正因为他们的助力,我们才能追求远大的理想。

    了解更多
  • 心怀梦想,成就一番事业

    我们希望您以饱满的热情投入到自己的工作岗位中,给全球数百万人带来美好生活。您的职业发展道路由您自己来掌控。您只管制定目标,我们会提供充足的培训机会和支持,让您得偿所愿。

    了解更多
  • 勇敢追梦,奔赴美好未来

    想要改变自己的生活,乃至改变全球数百万人的生活,该怎么做?加入我们,开启职业新篇章,然后在我们的保驾护航中展翅高飞,并向优秀的人求教,为这份事业做出切实的贡献。

    了解更多
  • 我们的办公地点

    我们的员工遍布60多个国家/地区。他们勠力同心,携手共创医疗健康领域的美好未来。无论您在哪里工作,我们的专家都会指导您推动职业发展,您也将能够运用先进的科学技术,取得意义非凡的重大突破。

    了解更多
  • 我们的人与文化

    我们是首个建立多元化、公平性和包容性(DE&I)委员会的制药企业。我们还建立了“菲常联盟”,为每位员工提供发声的平台。您的声音是我们建设未来道路的重要基石。

    了解更多
  • 您和我们相互依存,共同成长

    我们精心打造薪酬体系,为您的身心健康、财务健康与社交健康提供全面保障。我们有着海纳百川的包容性团队文化,无论您在哪个岗位,都能展翅高飞。

    了解更多
  • 为什么选择我们?

    我们为您提供各种工具、支持和培训机会,帮助您实现自己的目标。我们也希望您充分发挥潜力,帮助我们实现目标:将新药研发到临床治疗的时间减半。

    了解更多